Get 40% Off
👀 👁 🧿 All eyes on Biogen, up +4,56% after posting earnings. Our AI picked it in March 2024.
Which stocks will surge next?
Unlock AI-picked Stocks

US Air Force's new B-21 Raider "flying wing" bomber takes first flight - Reuters witness

Published 11/11/2023, 03:56 PM
Updated 11/11/2023, 04:02 PM
© Reuters. The United States Air Force's B-21 "Raider", the long-range stealth bomber that can be armed with nuclear weapons, rolls onto the runway at Northrop Grumman's site at Air Force Plant 42, during its first flight, in Palmdale, California, U.S., November 10,

By Mike Stone and David Swanson

(Reuters) -The U.S. Air Force's B-21 "Raider" bomber shaped like a flying wing took its first flight on Friday, the next step in rolling out a new fleet of long-range nuclear-capable stealth bombers built by Northrop Grumman (NYSE:NOC), according to a Reuters witness.

The B-21 left Northrop's facility at the Air Force's Plant 42 in Palmdale, California, at sunrise on Friday offering the first unscripted look at the new bomber which has been developed under strict security.

The plane took off at 6:51 a.m., according to a Reuters witness. Air Force leaders did not publicize the B-21's first flight, but about three dozens aviation enthusiasts and amateur photographers gathered around Plant 42 on Friday hoping to see the bomber take to the skies, according to the Reuters witness.

The B-21, which carries the same "flying wing" shape of its predecessor, the B-2, will be able to deliver both conventional and nuclear weapons around the world using long-range and mid-air refueling capabilities.

The aircraft are projected to cost approximately $550 million each in 2010 dollars, or about $750 million in today's inflation-adjusted dollars. However, the Air Force has kept other price information classified, "which makes validating the proposed cost difficult," the Congressional Research Service said in a 2021 report.

The Air Force plans to buy at least 100 of the planes and begin to replace B-1 and B-2 bombers. The B-1 costs about $60,000 per hour to operate and the B-2 costs about $65,000 per hour, according to Pentagon data.

3rd party Ad. Not an offer or recommendation by Investing.com. See disclosure here or remove ads .

Ann Stefanek, an Air Force spokesperson said, "The B-21 Raider is in flight testing. Flight testing is a critical step in the test campaign managed by the Air Force Test Center and 412th Test Wings B-21 Combined Test Force."

Six test aircraft are being produced now. They are being built on the same line, using the tools, processes and technicians that will build the production aircraft.

Northrop beat out a team comprised of Boeing (NYSE:BA) and Lockheed Martin (NYSE:LMT) when it won the 2015 contract to make the bomber. Engine-maker Pratt & Whitney, Collins Aerospace, GKN (LON:GKN) Aerospace, BAE Systems (LON:BAES) and Spirit Aerosystems are among the more than 400 suppliers in 40 states.

The B-21 was publicly unveiled in December 2022, but anticipation surrounding its first flight has been building for years.

In 2019, one top Air Force general hinted that the bomber could fly as early as December 2021, but the service later pushed that date to mid-2022. In early 2022, the Air Force further delayed it until 2023.

The B-21 program is in the Engineering and Manufacturing Development Phase and is on track to deliver aircraft to Ellsworth Air Force Base in the mid-2020s, according to the Air Force.

Northrop is calling the plane a sixth generation aircraft given its ability to connect to other aircraft and easily integrate future weapons into its systems architecture.

The B-21 also features more durable, stealth-enabling low observable surface material that is expected to require less maintenance and decrease operations costs and downtime.

3rd party Ad. Not an offer or recommendation by Investing.com. See disclosure here or remove ads .

Latest comments

Risk Disclosure: Trading in financial instruments and/or cryptocurrencies involves high risks including the risk of losing some, or all, of your investment amount, and may not be suitable for all investors. Prices of cryptocurrencies are extremely volatile and may be affected by external factors such as financial, regulatory or political events. Trading on margin increases the financial risks.
Before deciding to trade in financial instrument or cryptocurrencies you should be fully informed of the risks and costs associated with trading the financial markets, carefully consider your investment objectives, level of experience, and risk appetite, and seek professional advice where needed.
Fusion Media would like to remind you that the data contained in this website is not necessarily real-time nor accurate. The data and prices on the website are not necessarily provided by any market or exchange, but may be provided by market makers, and so prices may not be accurate and may differ from the actual price at any given market, meaning prices are indicative and not appropriate for trading purposes. Fusion Media and any provider of the data contained in this website will not accept liability for any loss or damage as a result of your trading, or your reliance on the information contained within this website.
It is prohibited to use, store, reproduce, display, modify, transmit or distribute the data contained in this website without the explicit prior written permission of Fusion Media and/or the data provider. All intellectual property rights are reserved by the providers and/or the exchange providing the data contained in this website.
Fusion Media may be compensated by the advertisers that appear on the website, based on your interaction with the advertisements or advertisers.
© 2007-2024 - Fusion Media Limited. All Rights Reserved.