On 6 January, Euromax (TO:EOX) released the results of its feasibility study on its 100%-owned Ilovica gold-copper porphyry project. At a headline discount rate of 5%, the reported post-tax NPV was US$440.1m (US$3.77/share), while the pre-tax IRR was 19.8%. Significantly, the estimate of initial capex reduced to US$474.3m cf US$501.8m in the 2014 pre-feasibility study. The result is indicative of a more capital-efficient project and comes despite the DFS using lower long-term metals prices.