Get 40% Off
👀 👁 🧿 All eyes on Biogen, up +4,56% after posting earnings. Our AI picked it in March 2024.
Which stocks will surge next?
Unlock AI-picked Stocks

Swiss complete trans-European rail route with Ceneri Tunnel under the Alps

Published 09/04/2020, 06:25 AM
Updated 09/04/2020, 06:31 AM
© Reuters. Opening ceremony of Ceneri Base Tunnel

By John Revill

CAMORINO, Switzerland (Reuters) - Switzerland officially opened the Ceneri Base Tunnel on Friday, the final piece in a direct, flat rail link connecting northern Europe to the Mediterranean via routes beneath the Alps.

The 15.4 kilometre (9.57 miles) tunnel marks the completion of the New Rail Link through the Alps (NRLA), a 22.8 billion Swiss franc ($25.04 billion) project dubbed Switzerland's construction project of the century.

Together with the 57.1 kilometre Gotthard Base Tunnel, the world's longest rail tunnel which opened in 2016, and the 34.6 kilometre Loetschberg tunnel, Ceneri completes a system that allows uninterrupted freight transport from Rotterdam and Genoa under the mountains.

"It's the last part of the puzzle," Swiss Federal Railways (SBB) Chief Executive Vincent Ducrot told reporters. "The goal to have a flat rail line through the Alps has now been achieved."

The tunnel, which has taken 10 years to build, runs beneath Monte Ceneri, replacing a steep surface railway which had a high-altitude tunnel at the top. Its north portal is situated

at Camorino, and the tunnel breaks through the mountains in the south at Vezia, near Lugano.

Switzerland wants to use the tunnel, which is due to enter service on Dec. 13. 2020, to transfer more freight transport from trucks to rail, decreasing CO2 emissions and protecting the Alpine environment.

"The environmental benefit is obvious, but it's not only about the Alps," Swiss President Simonetta Sommaruga, who attended the opening ceremony, told Reuters.

"It's a competitive advantage for Switzerland and a sustainable transport policy."

3rd party Ad. Not an offer or recommendation by Investing.com. See disclosure here or remove ads .

The 3.6 billion franc tunnel, the culmination of Switzerland's efforts to ease the transalpine journey which began with the opening of the Gotthard summit tunnel in 1882, can carry up to 170 freight trains and 180 passenger trains per day.

The project's aim is to reduction in the number of trucks crossing the Alps to 650,000 per year, cutting daily CO2 emissions by 890 tonnes. Last year, there were around 900,000 transalpine truck journeys, according to Swiss Federal Office of Transport.

Eventually the Milan to Zurich train journey will be cut from around 4 hours to three hours, and the SBB plans to run direct trains to Bologna and Genoa.

Freight trains will also be able to run uninterrupted along the 1,400 km stretch between Rotterdam to Genoa without technical hindrances.

Latest comments

Risk Disclosure: Trading in financial instruments and/or cryptocurrencies involves high risks including the risk of losing some, or all, of your investment amount, and may not be suitable for all investors. Prices of cryptocurrencies are extremely volatile and may be affected by external factors such as financial, regulatory or political events. Trading on margin increases the financial risks.
Before deciding to trade in financial instrument or cryptocurrencies you should be fully informed of the risks and costs associated with trading the financial markets, carefully consider your investment objectives, level of experience, and risk appetite, and seek professional advice where needed.
Fusion Media would like to remind you that the data contained in this website is not necessarily real-time nor accurate. The data and prices on the website are not necessarily provided by any market or exchange, but may be provided by market makers, and so prices may not be accurate and may differ from the actual price at any given market, meaning prices are indicative and not appropriate for trading purposes. Fusion Media and any provider of the data contained in this website will not accept liability for any loss or damage as a result of your trading, or your reliance on the information contained within this website.
It is prohibited to use, store, reproduce, display, modify, transmit or distribute the data contained in this website without the explicit prior written permission of Fusion Media and/or the data provider. All intellectual property rights are reserved by the providers and/or the exchange providing the data contained in this website.
Fusion Media may be compensated by the advertisers that appear on the website, based on your interaction with the advertisements or advertisers.
© 2007-2024 - Fusion Media Limited. All Rights Reserved.